Fortnightly Falkirk Roadworks Update
Below is a list of all planned and ongoing roadworks across Falkirk in the period 16 – 31 March 2026.
This includes essential maintenance, utility works, resurfacing, and infrastructure improvements that may cause disruption to travel.
Please check the status and traffic impact before travelling.
If you’re driving through affected areas, allow extra time for your journey.
Falkirk Roadworks
| Full Address | Duration | Planned Start | Planned End | Location | Description | Promoter Name | Status | Traffic Impact | Works Type |
|---|---|---|---|---|---|---|---|---|---|
| Tryst Road, Stenhousemuir | 3 | 16/03/2026 | 18/03/2026 | 109 Tryst Road, FK5 4QJ | 8mts and 2x coredrills | Virgin Media Limited | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Denny Road, Dennyloanhead | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Cables (new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| Glasgow Road, Denny | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Caples m(new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| Glasgow Road, Dennyloanhead | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Cables (new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| Nethermains Road, Denny | 30 | 19/01/2026 | 01/03/2026 | Site Entrance | Road Opening | Falkirk Council | ADVANCE PLANNING | HIGH | Major |
| George Street, Falkirk | 1 | 23/03/2026 | 23/03/2026 | For Customer at 21 Alma Street Falkirk FK2 7HD | To provide a safe working area for engineers to access EXISTING carriageway box(s) to provide service to a customer. 4-way lights. 1 working day 0930-1530 ** No Excavation ** | BT | PROPOSED WORKS | HIGH | Minor Without Excavation |
| Russel Street, Falkirk | 1 | 23/03/2026 | 23/03/2026 | For Customer at 21 Alma Street Falkirk FK2 7HD | To provide a safe working area for engineers to access EXISTING carriageway box(s) to provide service to a customer. 4-way lights. 1 working day 0930-1530 ** No Excavation ** | BT | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| Harlow Avenue, Brightons | 3 | 16/03/2026 | 18/03/2026 | West FW, Harlow Ave at Newlands RD Roundabout | Repairing, Resetting, and replacing manhole or chamber | BT | PROPOSED WORKS | HIGH | Minor With Excavation |
| Harlow Avenue, Brightons | 3 | 16/03/2026 | 18/03/2026 | East FW, Harlow Ave at Newlands RD Roundabout | Repairing, Resetting, and replacing manhole or chamber | BT | PROPOSED WORKS | HIGH | Minor With Excavation |
| Duncarron Place, Denny | 3 | 12/03/2026 | 16/03/2026 | SIDE OF 4 DUNCARRON PLACE DENNY FK6 | Enabling new localised ultra-fast broadband connections This activity involves excavation to Install telecoms duct to provide service and reinstatement | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Kestrel Drive, Brightons | 9 | 04/03/2026 | 16/03/2026 | 7 BATTOCK ROAD BRIGHTONS FK20TT | Enabling telecoms duct to provide service and reinstatement new localised ultra-fast broadband connections This activity involves excavation to Install | BT | IN PROGRESS | MEDIUM | Standard |
| Slamannan Road, Falkirk | 3 | 11/03/2026 | 13/03/2026 | 2 SLAMANNAN ROAD PRINCESS GATE FK15BP | Enabling telecoms duct to provide service and reinstatement new localised ultra-fast broadband connections This activity involves excavation to Install | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Solway Drive, Head Of Muir | 31 | 09/02/2026 | 23/03/2026 | 32, Solway Drive, Denny, FK6 5NS | Enabling new localised ultra-fast broadband connections This activity involves excavation to Install telecoms duct to provide service and reinstatement | BT | IN PROGRESS | MEDIUM | Standard |
| M876 Eastbound Junction 1 Off And On Slip From Junction With M80, Denny | 2 | 26/03/2026 | 28/03/2026 | M876 - EB - Jct 1 off slip | Nightworks - drainage - slip closureMotorists travelling eastbound on the M876 wishing to use the Junction 1 Off slip (Denny) will be directed to continue on the M876 Eastbound and take the next exit at Junction 2 (North Broomage). From there, at the roundabout, signage will direct traffic to take the 5th exit and return onto the M876 Westbound via the Junction 2 On slip. Traffic will then be directed to use the Westbound Off slip at Junction 1 (Denny) and carry onto the B905. From there, at the roundabout (Checkbar), signage will direct traffic to take the 3rd exit onto A883 where the diversion will terminate. | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | HIGH | Standard |
| M876 Westbound Through Junction 2 From Junction 3, Falkirk | 4 | 23/03/2026 | 26/03/2026 | M876 - WB - Jct 2 to Jct 1 | Nightworks - drainage - lane closure - No works carried out 24th March overnight | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | MEDIUM | Standard |
| M9 Eastbound From Junction 7 To Junction 6, Falkirk | 1 | 22/03/2026 | 23/03/2026 | M9 - EB - Jct 7 to Jct 6 | Nightworks - barrier repair - OS lane closure | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| M9 Eastbound Through Junction 7 From Junction 8, Falkirk | 24 | 24/02/2026 | 28/03/2026 | M9 - EB - Jct 7 to Jct 6 | Nightworks - Bridge joint repair - Road closure - Phase When required. No weekends - No closure between 07/03/26 and 23/03/26.Diversion - M9 Jct 7>M876>A905>M9 J5 SB | Transport Scotland - SE Unit Op Company | IN PROGRESS | ROAD CLOSURE | Major |
| M876 Eastbound From Junction With M80 To Junction 1, Falkirk | 4 | 24/03/2026 | 28/03/2026 | M876 - WB - M80 merge to Jct 1 | Nightworks - drainage - Lane closure - no works on 25th March overnight | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | MEDIUM | Standard |
| M9 Eastbound From Junction 7 To Junction 6, Falkirk | 2 | 18/03/2026 | 19/03/2026 | M9 - EB - Jct 7 to Jct 6 | Nightworks - patching - NS Lane closure | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| M876 Eastbound From Junction With M80 To Junction 1, Falkirk | 2 | 25/03/2026 | 26/03/2026 | M876 - EB - M80/M876 merge to Jct 1 | Nightworks - resurfacing - Road closure.Traffic diverted via M80 NB to Junction 9 NB Off slip to Bannockburn Interchange, M9 SB to Junction 7 SB Off slip, M876 EB to Jct 3 EB Off slip, M876 WB Jct 3 on slip, M9 Junction 7 NB On slip, M9 NB Junction 8 NB Off slip to M876 Junction 1. | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | ROAD CLOSURE | Standard |
| Bellevue Street, Falkirk | 2 | 17/03/2026 | 18/03/2026 | Approx. 45m north of Callendar Road r/about | Trial hole investigationN3SW Civils team required to execute a hand trial dig with possible trenches off this to check feasibility for potential incoming new ESSENTIAL Street works Mobile Telco Mast. | Telefonica UK | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Canalside Drive, Reddingmuirhead | 6 | 09/03/2026 | 16/03/2026 | 2.91057E+11 | LAY DUCT - | BT | IN PROGRESS | MEDIUM | Urgent |
| B825 From Bowhouse Roundabout To Manuel Terrace Whitecross, Whitecross | 1 | 23/03/2026 | 23/03/2026 | (LINLITHGOW)B825 NEAR JCN MANUEL TERRACE WHITECROSSEH49 6JG | Replace pole | BT | PROPOSED WORKS | HIGH | Minor With Excavation |
| Wheatlands Avenue, Bonnybridge | 10 | 13/03/2026 | 26/03/2026 | O/S 43 | Excavate, backfill and reinstate for a new service | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Burns Avenue, Grangemouth | 10 | 26/03/2026 | 08/04/2026 | O/S 16 | Excavate in footpath for a new service | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Elmbank Crescent, Dennyloanhead | 10 | 10/03/2026 | 23/03/2026 | O/S 30/32/34 | Excavate, backfill and reinstate for a new service | SP Energy Networks | IN PROGRESS | MEDIUM | Standard |
| Falkirk Road, Bonnybridge | 10 | 12/03/2026 | 25/03/2026 | O/S 115 | Excavate, backfill and reinstate to install a new linkbox | SP Energy Networks | IN PROGRESS | HIGH | Standard |
| Smeaton Drive, Bonnybridge | 10 | 12/03/2026 | 25/03/2026 | Junction with Falkirk Road | TM ONLY, required to safely install new linkbox on Falkirk Road | SP Energy Networks | IN PROGRESS | MEDIUM | Standard |
| Prospecthill Road, Falkirk | 1 | 13/03/2026 | 13/03/2026 | R/O 1 Glenview - O/S 12 | ***REMEDIAL PHASE*** to rectify national coring failure | SP Energy Networks | PROPOSED WORKS | MEDIUM | Remedial Other |
| Bruce Street, Falkirk | 5 | 21/03/2026 | 28/03/2026 | BETWEEN NO 265-271 | Sewer R&M | Scottish Water | PROPOSED WORKS | ROAD CLOSURE | Major |
| Duke Street, Denny | 6 | 10/03/2026 | 17/03/2026 | Duke Street at Junction of Davies Row Denny FK6 6DB | REPLACE FIRE HYDRANT | Scottish Water | IN PROGRESS | ROAD CLOSURE | Standard |
| C7 From Vellore Road Maddiston To Vellore House, Maddiston | 5 | 10/03/2026 | 16/03/2026 | THE COACH HOUSE, VELLORE,MADDISTONFALKIRKFK2 0BN | REPAIR BURST COMM PIPE | Scottish Water | IN PROGRESS | HIGH | Urgent |
| Seaforth Road, Falkirk | 3 | 12/03/2026 | 16/03/2026 | O/S 89 & 90-94 | SERVICE CONNECTIONS | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Wallacestone Brae, Wallacestone | 10 | 11/03/2026 | 24/03/2026 | OS JASMINE COTTAGE | URGENT - LEAKAGE REPAIR | Scottish Water | IN PROGRESS | MEDIUM | Urgent |
| Gartcows Avenue, Falkirk | 10 | 04/03/2026 | 17/03/2026 | OS NO 5 | URGENT - LEAKAGE REPAIR | Scottish Water | IN PROGRESS | MEDIUM | Urgent |
| Station Road, Brightons | 6 | 09/03/2026 | 16/03/2026 | LYNDHURST, STATION ROAD,BRIGHTONSFALKIRKFK2 0TY | Repair burst | Scottish Water | IN PROGRESS | HIGH | Urgent |
| Wallace Brae Gardens, Reddingmuirhead | 5 | 11/03/2026 | 17/03/2026 | 7 , WALLACE BRAE GARDENS ,REDDINGMUIRHEADFALKIRKFK2 0GA | REPAIR BURST COMM PIPE | Scottish Water | IN PROGRESS | MEDIUM | Urgent |
| Main Street, Redding | 22 | 02/03/2026 | 31/03/2026 | os no 103 | sewer r&m | Scottish Water | IN PROGRESS | HIGH | Urgent |
| Hunter Gardens, Denny | 3 | 25/03/2026 | 27/03/2026 | 13 Hunters Gardens Denny | Water Toby Low and damaged | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Cranshaws Drive, Redding | 18 | 06/03/2026 | 31/03/2026 | OS NO 14 | URGENT - NON STANDARD SEWER REPAIR WORKS | Scottish Water | IN PROGRESS | MEDIUM | Urgent |
| Glenfuir Street, Falkirk | 6 | 16/03/2026 | 23/03/2026 | OS NO 7 | Sewer R&M | Scottish Water | PROPOSED WORKS | ROAD CLOSURE | Major |
| Hunter Gardens, Denny | 3 | 25/03/2026 | 27/03/2026 | 19 Hunters Gardens Denny | Water Toby low and missing cover | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Roman Road, Bonnybridge | 3 | 13/03/2026 | 17/03/2026 | 43 Roman Road Bonnybridge | Noisy Manhole | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| From A883 Forming Two Culs-De-Sac, Denny | 6 | 23/03/2026 | 30/03/2026 | 1 Beech Tree ParkDennyFK6 6BU | Make BCV accessible and operable & Replace Cover & Frame | Scottish Water | PROPOSED WORKS | MEDIUM | Standard |
| Vellore Road, Maddiston | 3 | 25/03/2026 | 27/03/2026 | Close to Dhillon Terrace | Low noisy AV cover | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Union Place, Brightons | 10 | 04/03/2026 | 17/03/2026 | OS NO 90 | URGENT - LEAKAGE REPAIR | Scottish Water | IN PROGRESS | MEDIUM | Urgent |
| Larbert Road, Bonnybridge | 3 | 13/03/2026 | 17/03/2026 | 41 Larbert Road Bonnybridge | Water Toby is rocking and causing Concern | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Main Street, Redding | 3 | 27/03/2026 | 31/03/2026 | J/N 1 | Perm Proposed Of Excavate footway to repair chamber | Virgin Media Limited | ADVANCE PLANNING | MEDIUM | Minor With Excavation |
| Duncan Street, Bonnybridge | 10 | 23/03/2026 | 03/04/2026 | Outside No.24 | New Gas Connection | SGN | PROPOSED WORKS | MEDIUM | Standard |
| Dochart Crescent, Polmont | 279 | 17/12/2025 | 21/01/2027 | entire street | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Taymouth Road, Polmont | 84 | 13/01/2026 | 08/05/2026 | entire street | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Breadalbane Place, Polmont | 105 | 11/12/2025 | 12/05/2026 | jct dochart to 21 | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Lawers Crescent, Polmont | 74 | 19/01/2026 | 30/04/2026 | jct kenmore to os 69 | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Greenpark Drive, Polmont | 20 | 23/02/2026 | 20/03/2026 | 1 to 18 | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| B8028 From Falkirk Road Glen Village To Cross Brae Shieldhill, Falkirk | 15 | 09/03/2026 | 27/03/2026 | Outside Westerpileyhill Farm | New Gas Connection | SGN | IN PROGRESS | MEDIUM | Major |
| Killin Drive, Polmont | 84 | 13/01/2026 | 08/05/2026 | 1 to 22 | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Portree Crescent, Polmont | 84 | 13/01/2026 | 08/05/2026 | 3 | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Tamfourhill Avenue, Falkirk | 10 | 09/03/2026 | 20/03/2026 | O/s 23 | Excavate a joint hole within modular footpath Backfill and reinstate joint hole once the cable jointer has carried out jointing work | SP Energy Networks | IN PROGRESS | MEDIUM | Standard |
| Denny Road, Dennyloanhead | 1 | 13/03/2026 | 14/03/2026 | Denny Road After Park Avenue FK4 1SD | Replacement of bus shelterContractor: CommutaportsContact: Stephen Keegan SKeegan@commutaports.com/0141 762 2626 | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| A9 From Bog Roundabout To Falkirk Stadium Roundabout, Falkirk | 5 | 30/03/2026 | 03/04/2026 | B905/02 structure | Works to clean out culvert pipes for CCTV inspection. | Falkirk Council | PROPOSED WORKS | HIGH | Standard |
| Annet Road, Head Of Muir | 16 | 25/02/2026 | 18/03/2026 | full street | Column InstallationTracking works | Falkirk Council | IN PROGRESS | MEDIUM | Standard |
| Denny Road, Dennyloanhead | 2 | 13/03/2026 | 16/03/2026 | Denny Road Opp Bankview FK4 1SF | Replacement of bus shelterContractor: CommutaportsContact: Stephen Keegan SKeegan@commutaports.com/0141 762 2626 | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| A9 From Falkirk Stadium Roundabout To Westfield Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | A9 | Widening of A9 as part of the TIF Infrastructure Improvements. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Old Main Street, Maddiston | 3 | 12/03/2026 | 16/03/2026 | Old Main Street, Maddiston | Drainage Pipe replacement works | Falkirk Council | IN PROGRESS | MEDIUM | Minor With Excavation |
| Katrine Place, Head Of Muir | 16 | 25/02/2026 | 18/03/2026 | full street | Column InstallationTracking works | Falkirk Council | IN PROGRESS | MEDIUM | Standard |
| Denny Road, Dennyloanhead | 2 | 13/03/2026 | 16/03/2026 | Denny Road At Bankview FK4 1SF | Replacement of bus shelterContractor: CommutaportsContact: Stephen Keegan SKeegan@commutaports.com/0141 762 2626 | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Annet Road, Head Of Muir | 16 | 25/02/2026 | 18/03/2026 | from no.12 to sports pavillion | Column InstallationTracking works | Falkirk Council | IN PROGRESS | MEDIUM | Standard |
| A904 From Falkirk Road Grangemouth To Westfield Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | Westfield R/A to Midthorn Bridge. | Widening of A904 & installation of new underpass @ Midthorn. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Johnston Place, Denny | 3 | 13/03/2026 | 17/03/2026 | Baxter Crescent to Nethermains Road | Coring operation | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Earls Gate Roundabout, Grangemouth | 668 | 22/07/2024 | 26/02/2027 | Earls Gate roundabout including M9 Slip Road. | Part of TIF A9/A904 Improvements. | Falkirk Council | IN PROGRESS | HIGH | Standard |
| Baxter Crescent, Denny | 3 | 13/03/2026 | 17/03/2026 | Johnston Place to road end | Coring operation | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| A9 From Westfield Roundabout To Etna Road Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | A9. | Widening A9 & construction of a new r/a as part of the TIF Infrastructure Improvements. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Denny Road, Dennyloanhead | 1 | 13/03/2026 | 14/03/2026 | Denny Road Opp Park Avenue FK4 1SD | Replacement of bus shelterContractor: CommutaportsContact: Stephen Keegan SKeegan@commutaports.com/0141 762 2626 | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Maple Place, Dunipace | 3 | 13/03/2026 | 17/03/2026 | Whole street | Coring operation | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Westfield Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | Westfield Roundabout. | Signalisation of roundabout & construction of left turn lanes. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Grangemouth Road, Falkirk | 939 | 03/07/2023 | 26/02/2027 | Jct. of Middlefield Road to Westfield R/A. | Widening of A904. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Hunter Gardens, Denny | 3 | 13/03/2026 | 17/03/2026 | Whole street | Coring operation | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| C20 From Stirling Street Dunipace To B905, Falkirk | 0 | 28/03/2026 | 29/03/2026 | Denovan Road/M876 slip to B905 | Carriageway resurfacing | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | Minor With Excavation |
| C51 From Lathallan Roundabout To Smiddy Brae Polmont With Branch To Wholeflats Road, Falkirk | 331 | 17/03/2025 | 26/06/2026 | Jinkabout Bridge junction to Polmonthill Cottage | Land slip | Falkirk Council | IN PROGRESS | ROAD CLOSURE | Emergency |
| High Street, Bonnybridge | 3 | 14/03/2026 | 18/03/2026 | BONNYBRIDGE - NEAR 12 HIGH STREET, FK4 1DB | 10m New overlay | BT | PROPOSED WORKS | HIGH | Minor With Excavation |
| Drove Loan, Bonnybridge | 3 | 13/03/2026 | 17/03/2026 | BONNYBRIDGE - NEAR 1 BOWLING GREEN PLACE, FK4 1DS | 10m New overlay | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| C7 From Station Road Whitecross To B825, Whitecross | 2 | 23/03/2026 | 24/03/2026 | Railway bridge | Installation of timber handrails on railway bridge parapet walls and wingwalls. Nightshift work times. | Network Rail | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| Station Road, Whitecross | 2 | 23/03/2026 | 24/03/2026 | Railway bridge | Installation of timber handrails on railway bridge parapet walls and wingwalls. Nightshift work times. | Network Rail | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| C51 From Lathallan Roundabout To Smiddy Brae Polmont With Branch To Wholeflats Road, Falkirk | 3 | 16/03/2026 | 18/03/2026 | APPROX 100M EITHER SIDE OF THE BUNGALOW | TRIAL HOLES | Scottish Water | PROPOSED WORKS | HIGH | Minor With Excavation |
| Manuel Terrace, Whitecross | 21 | 09/03/2026 | 06/04/2026 | Works are located on Manuel Terrace from sub station to Almond Terrace junction. | Works are required to excavate and install Elec HV for new housing development. | The Electricity Network Company Limited | IN PROGRESS | MEDIUM | Major |
Important Notes
-
In Progress works are already underway and may cause delays.
-
Proposed Works are planned but may change depending on weather or utility coordination.
-
Advance Planning indicates long-term works being prepared for future delivery.
This page is updated fortnightly to reflect the roadworks scheduled for the upcoming two week. For live updates, diversions, and completion reports, please visit the Roadworks Scotland website.