Falkirk Roadworks
| Full Address | Duration | Planned Start | Planned End | Location | Description | Promoter Name | Status | Traffic Impact | Works Type |
|---|---|---|---|---|---|---|---|---|---|
| Main Road, Maddiston | 5 | 09/04/2026 | 15/04/2026 | Main Road Maddiston, Falkirk, FK2 0GT | 21m Verge, 16m FW, FW4 | Virgin Media Limited | IN PROGRESS | MEDIUM | Standard |
| Glenfuir Road, Falkirk | 5 | 08/04/2026 | 14/04/2026 | 82 M FROM JUNCTION OF Westburn Avenue | clear blockages | Virgin Media Limited | PROPOSED WORKS | HIGH | Standard |
| Glenfuir Road, Falkirk | 5 | 08/04/2026 | 14/04/2026 | B816 Rear of 12 Collingwood Ct, Falkirk, FK1 5JF | clear blockagesB | Virgin Media Limited | PROPOSED WORKS | HIGH | Standard |
| Standrigg Road, Brightons | 3 | 17/04/2026 | 21/04/2026 | outside 21 to 27 Standrigg Road | CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND. NO CARRIAGEWAY EXCAVATIONS REQUIRED. | Virgin Media Limited | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Wallacestone Brae, Wallacestone | 3 | 09/04/2026 | 13/04/2026 | outside All-yn to Ochilview on Wallacestone Brae | NEW SERVICE CONNECTION. CUSTOMER RESIDENTIAL SUPPLY. and CLEAR BLOCKAGES IF FOUND. NO CARRIAGEWAY EXCAVATIONS REQUIRED. | Virgin Media Limited | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Windsor Road, Falkirk | 5 | 09/04/2026 | 15/04/2026 | 210 Windsor Rd, Falkirk, FK1 5DG | clear blockages | Virgin Media Limited | IN PROGRESS | MEDIUM | Standard |
| Blair Place, Falkirk | 3 | 09/04/2026 | 13/04/2026 | outside 4 to 8 Blair Place | CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND. NO CARRIAGEWAY EXCAVATIONS REQUIRED. | Virgin Media Limited | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| High Station Road, Falkirk | 3 | 29/04/2026 | 01/05/2026 | outside 7 to 15 and 118 to 84 High Station Road | NEW SERVICE CONNECTION. CUSTOMER RESIDENTIAL SUPPLY and CLEAR BLOCKAGES IF FOUND. NO CARRIAGEWAY EXCAVATIONS REQUIRED. | Virgin Media Limited | ADVANCE PLANNING | HIGH | Minor With Excavation |
| Strathyre Place, Falkirk | 5 | 17/04/2026 | 23/04/2026 | STRATHYRE PLACE FALKIRK FK1 5UU | PIA Carriageway blockage (cobbles) | Virgin Media Limited | PROPOSED WORKS | MEDIUM | Standard |
| Denny Road, Head Of Muir | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Caples m(new development) | Falkirk Council | PROPOSED WORKS | MEDIUM | Major |
| Glasgow Road, Dennyloanhead | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Cables (new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| Nethermains Road, Denny | 30 | 19/01/2026 | 01/03/2026 | Site Entrance | Road Opening | Falkirk Council | ADVANCE PLANNING | HIGH | Major |
| Drove Road, Head Of Muir | 92 | 23/02/2026 | 30/06/2026 | Drove Roat - Glasgow Road | S109 Install Scottish Power Caples m(new development) | Falkirk Council | PROPOSED WORKS | MEDIUM | Major |
| Glasgow Road, Denny | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Caples m(new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| Orchardhall Way, Falkirk | 10 | 02/04/2026 | 15/04/2026 | Whole Road | New drainage and service connections | Falkirk Council | IN PROGRESS | MEDIUM | Standard |
| Glasgow Road, Longcroft | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Cables (new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| Denny Road, Dennyloanhead | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Cables (new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| Manuel Terrace, Whitecross | 20 | 13/04/2026 | 08/05/2026 | Junction Manuel Terrace, Whitecross | Rising Main Install | Falkirk Council | PROPOSED WORKS | MEDIUM | Major |
| Davids Loan, Falkirk | 3 | 17/04/2026 | 21/04/2026 | David's Loan outside Hair Inspirations | BT Manhole is low and causing concern | BT | PROPOSED WORKS | HIGH | Minor With Excavation |
| Mungalhead Road, Falkirk | 3 | 17/04/2026 | 21/04/2026 | jct Davids Loan | Tm for works on Davids Loan | BT | PROPOSED WORKS | HIGH | Minor Without Excavation |
| Carron Road, Falkirk | 3 | 17/04/2026 | 21/04/2026 | jct Davids Loan | Tm for works on Davids Loan | BT | PROPOSED WORKS | HIGH | Minor Without Excavation |
| Main Street, Bainsford, Falkirk | 3 | 17/04/2026 | 21/04/2026 | jct Davids Loan | Tm for works on Davids Loan | BT | PROPOSED WORKS | HIGH | Minor Without Excavation |
| Hillcrest Place, Head Of Muir | 3 | 08/04/2026 | 10/04/2026 | 15 HILLCREST PLACE FK6 5PN DENNY BONNYBRIDGE, FK6 5PW | Enabling new localised ultra-fast broadband connections This activity involves excavation to Install telecoms duct to provide service and reinstatement | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Ochil View, Denny | 3 | 08/04/2026 | 10/04/2026 | 31 Ochil view, Denny, FK65NQ, Denny | Enabling new localised ultra-fast broadband connections This activity involves excavation to Install telecoms duct to provide service and reinstatement | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Oak Hill View, Maddiston | 3 | 10/04/2026 | 14/04/2026 | 7 OAKHILL VIEW FK2 0DB FALKIRK POLMONT, FK2 0DB | Enabling new localised ultra-fast broadband connections This activity involves excavation to Install telecoms duct to provide service and reinstatement | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Randyford Road, Falkirk | 3 | 14/04/2026 | 16/04/2026 | o/s TYRE SERVICES GB LTD TANNERY GARAGE, GRANGEMOUTH ROAD FALKIRK, FK2 9DD | Enabling new localised ultra-fast broadband connections This activity involves excavation to Install telecoms duct to provide service and reinstatement | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| M80 Northbound From Junction 7 To Junction 8, Falkirk | 1 | 10/04/2026 | 11/04/2026 | M80 - NB - Jct 7 to Jct 8 | Nightworks - patching - NS Lane closure | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| M80 From Junction 8 To Council Boundary, Falkirk | 3 | 20/04/2026 | 22/04/2026 | M80 - NB - Jct 8 to Jct 9 | Nightworks - resurfacing - Road closure. Works to be carried out under existing scheme. Traffic diverted via M876 EB, M876 Jct 3 EB Off slip to return, M876 Jct 3 WB On slip, M9 Jct 7 NB On slip and continue through Jct 8 to M9 Jct 9 to join Pirnhall Roundabout, or onward North. | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | ROAD CLOSURE | Standard |
| M80 Southbound From Junction 8 To Junction 7, Falkirk | 2 | 09/04/2026 | 10/04/2026 | M80 - SB - Jct 8 to Jct 7 | Nightworks - patching - lane closure | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| M80 Northbound From Junction 7 To Junction 8, Falkirk | 65 | 13/04/2026 | 11/07/2026 | m80 - jct 7-8 m876 join to m80 | dayworks - hard shoulder closure/nightworks - lane closure - Gantry replacement. | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | MEDIUM | Major |
| M9 Westbound From Council Boundary To Junction 4, Falkirk | 2 | 27/04/2026 | 28/04/2026 | M9 WB - J3-J4 | Nightworks - Barrier repair | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| M80 Northbound From Junction 7 To Junction 8, Falkirk | 65 | 13/04/2026 | 11/07/2026 | M80 - NB /SB - Jct 7 to Jct 9 and associated slips with M876 | nightworks - Gantry replacement works - Road closures. Dates TBC, no weekends. i. M80 Northbound traffic will be directed to leave the motorway at Junction 6 Old Inns and follow the B816 to Bonnybridge then east from Bonnybridge along the A803 before taking the A883 at the Three Bridges Roundabout then join the M876 at Junction 1, leave the M876 at Junction 3 Bowtrees and use the interchange to turn and re-join the M876 westbound from where they will join the M9 northbound at Junction 7 and continue towards Junction 9. ii. M876 Westbound traffic will be directed to leave the motorway at Junction 1 onto the B905 towards the Checkbar Roundabout and then take the A883 east. At the Three Bridges Roundabout they would be diverted west along the A803 to Bonnybridge and then onto the B816 until the Old Inns interchange where they can join the M80. iii. M80 Southbound traffic from Junction 9 will be directed to continue on the M9 and exit onto the M876 at Junction 7 Kinnaird. They would then be directed to leave the M876 at Junction 3 Bowtrees and use the interchange to turn and re-join the M876 westbound from where they would continue until Junction 1 and then follow the M876 diversion as above. | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | ROAD CLOSURE | Major |
| M80 From Council Boundary To Junction 8, Falkirk | 5 | 24/04/2026 | 30/04/2026 | M80 - SB - Jct 9 to Jct 8 - and approaches | Nightworks - Bridge parapet DCP Structural repairs - Road closure 25/04/26 and 01/05/26. Diversion: Traffic will be directed to continue South on the M9 to Jct 7 and take the link to the M876 EB to Jct 3 Bowtrees. Exit the EB off slip and take the 3rd exit onto the A905 SB, at the 2nd Rbt take the 2nd exit to return to the M876 WB. Continue West on the M876 re-join the M80 at Jct 8 (merge). | Transport Scotland - SE Unit Op Company | IN PROGRESS | ROAD CLOSURE | Urgent |
| M9 Eastbound Through Junction 7 From Junction 8, Falkirk | 5 | 27/04/2026 | 02/05/2026 | M9 - EB and WB- Jct 7 to Jct 6 | Nightworks - Additional Bridge joint repairs - Road closure. No weekends - No Diversion: Traffic will be directed to exit the M9 at Jct 7 for the M876 Eastbound, take Jct 3 Bowtrees off slip and head South on the A905 through Bowtrees Interchange to South Bellsdyke Rbt, take the 2nd exit onto the A88 Bellsdyke Road and head West to Antonshill Rbt, take the 1st exit onto the B902 South to New Carron Rbt, take the 2nd exit onto Ronades Road heading South to Merchiston Rbt and take the 1st exit onto the A9 East, continue on the A9 to Cadgers Brae Rbt and return to the M9 at Jct 5 | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | ROAD CLOSURE | Standard |
| M9 Westbound From Council Boundary To Junction 4, Falkirk | 1 | 10/04/2026 | 11/04/2026 | M9 - WB - Jct 4 between slips | Nightworks - patching - lane closure | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Windsor Road, Falkirk | 5 | 20/04/2026 | 24/04/2026 | Opposite JCt Summerford Road | Low broken MH cover on carriageway, Falkirk Council have surfacing works starting soon, please replace asap | BT | PROPOSED WORKS | MEDIUM | Standard |
| Maddiston Road, Rumford | 5 | 20/04/2026 | 24/04/2026 | Opposite 15 Craigs Terrace | Cover breaking up causing trip hazard | BT | PROPOSED WORKS | HIGH | Standard |
| Ward Avenue, Redding | 10 | 21/04/2026 | 04/05/2026 | O/S 41 | excavate for a new service | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Crimond Place, Shieldhill | 10 | 20/04/2026 | 01/05/2026 | Jct with Belmont Ave | Excavating to upgrade mains cable | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Bantaskine Drive, Falkirk | 10 | 06/04/2026 | 17/04/2026 | O/S 15 - 30 | EXCAVATION INSTALLATION AND REINSTATEMENT FOR NEW ELECTRIC SERVICE | SP Energy Networks | IN PROGRESS | ROAD CLOSURE | Major |
| Chacefield Street, Bonnybridge | 10 | 02/04/2026 | 15/04/2026 | O/S 20 | excavate for a new service | SP Energy Networks | IN PROGRESS | MEDIUM | Standard |
| Belmont Avenue, Shieldhill | 10 | 20/04/2026 | 01/05/2026 | O/s 1 - 5 | Excavating to upgrade mains cable | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Belmont Avenue, Shieldhill | 10 | 18/04/2026 | 01/05/2026 | O/S 1 | Upgrading Mains cable | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Main Street, Stenhousemuir | 3 | 14/04/2026 | 16/04/2026 | Main Street Stenhousemuir across from no 569 | Water Toby low and missing cover | Scottish Water | PROPOSED WORKS | HIGH | Minor With Excavation |
| Bonnyfield Road, Bonnybridge | 3 | 29/04/2026 | 01/05/2026 | 4 Bonnyfield Road Bonnybridge | scour valve low and rocking causing trip hazard | Scottish Water | ADVANCE PLANNING | HIGH | Minor With Excavation |
| Thornbridge Road, Falkirk | 10 | 02/04/2026 | 15/04/2026 | OS NO 67 | URGENT - LEAKAGE REPAIR | Scottish Water | IN PROGRESS | ROAD CLOSURE | Urgent |
| Lochhead Avenue, Denny | 3 | 28/04/2026 | 30/04/2026 | 1 Lochhead Ave Denny | SW Manhole low, worn and causing concern | Scottish Water | PROPOSED WORKS | ROAD CLOSURE | Minor With Excavation |
| Union Road, Grangemouth | 3 | 22/04/2026 | 24/04/2026 | Union Road Grangemouth just before Flats | Water Toby is low and damaged | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Quarry Brae, Brightons | 3 | 09/04/2026 | 13/04/2026 | Jct Maddiston Road | Worn no skid resistance, low mh cover | Scottish Water | IN PROGRESS | MEDIUM | Minor With Excavation |
| Stanley Gardens, Maddiston | 3 | 15/04/2026 | 17/04/2026 | 33 | Rocking, noisy MH covers causing surround to break up | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Singers Place, Dennyloanhead | 3 | 15/04/2026 | 17/04/2026 | After speed ramp before 1 Singers Place Dennyloanhead Bonnybridge FK4 1FD | Manhole frame and cover rocking causing noise 24/7 resident states it disturbs their sleep when struck by vehicles during the night | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Woodland Way, Denny | 4 | 08/04/2026 | 13/04/2026 | woodland way at side of no 2 | SW Manhole low and causing concern | Scottish Water | IN PROGRESS | MEDIUM | Standard |
| Seaforth Road, Falkirk | 5 | 07/04/2026 | 13/04/2026 | 94, SEAFORTH ROAD FALKIRK FK2 7TQ | Repair burst stopvalve | Scottish Water | IN PROGRESS | MEDIUM | Urgent |
| Davids Loan, Falkirk | 9 | 14/04/2026 | 24/04/2026 | o/s 219 | service connection | Scottish Water | PROPOSED WORKS | HIGH | Standard |
| Souillac Drive, Denny | 10 | 02/04/2026 | 15/04/2026 | OS NO 31 | URGENT - LEAKAGE REPAIR | Scottish Water | IN PROGRESS | MEDIUM | Urgent |
| Hunter Gardens, Denny | 3 | 15/04/2026 | 17/04/2026 | 19 Hunters Gardens Denny | Water Toby low and missing cover | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Firs Street, Falkirk | 5 | 10/04/2026 | 16/04/2026 | IN ROAD OUTSIDE 31.36 FIRS STREET. Approx XY: 289216 / 680590 | PERMANENT DISCONNECTION | Scottish Water | PROPOSED WORKS | MEDIUM | Standard |
| High Street, Bonnybridge | 10 | 02/04/2026 | 15/04/2026 | OS NO 13 | URGENT - Sewer R&M - manhole cover needs raised and drawdowns required | Scottish Water | IN PROGRESS | HIGH | Urgent |
| Main Street, Stenhousemuir | 3 | 14/04/2026 | 16/04/2026 | Main st Stenhousemuir across from no 569 | Scour Valve low and causing trip hazard | Scottish Water | PROPOSED WORKS | HIGH | Minor With Excavation |
| Glenfuir Street, Falkirk | 6 | 09/04/2026 | 16/04/2026 | OS NO 7 | Sewer R&M - 1.6m dig on footpath to fix sewer | Scottish Water | PROPOSED WORKS | MEDIUM | Standard |
| Stirling Street, Denny | 3 | 22/04/2026 | 24/04/2026 | Stirling Street just off of Roundabout at Motor garage | SW Manhole is low and noisy causing concern to Owner of Motor Garage | Scottish Water | PROPOSED WORKS | HIGH | Minor With Excavation |
| Glasgow Road, Falkirk | 0 | 25/04/2026 | 26/04/2026 | Opposite 292 | Low noisy MH cover | Scottish Water | PROPOSED WORKS | HIGH | Minor With Excavation |
| Anderson Drive, Denny | 10 | 06/04/2026 | 17/04/2026 | OS NO 22/24 | URGENT - LEAKAGE REPAIR | Scottish Water | IN PROGRESS | MEDIUM | Urgent |
| Main Street, Redding | 3 | 18/04/2026 | 22/04/2026 | J/N 1 | Perm Proposed Of Excavate footway to repair chamber | Virgin Media Limited | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Priory Road, Whitecross | 3 | 13/04/2026 | 15/04/2026 | 28 | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| Dochart Crescent, Polmont | 279 | 17/12/2025 | 21/01/2027 | entire street | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Finistere Avenue, Falkirk | 21 | 27/03/2026 | 24/04/2026 | o/s Breton Court | emergency works to investigate potential gas escape | SGN | IN PROGRESS | MEDIUM | Emergency |
| Avontoun Crescent, Whitecross | 3 | 13/04/2026 | 15/04/2026 | 22 | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| Haining Terrace, Whitecross | 3 | 13/04/2026 | 15/04/2026 | 40 | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| Avontoun Crescent, Whitecross | 3 | 13/04/2026 | 15/04/2026 | jct | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| Avontoun Crescent, Whitecross | 3 | 13/04/2026 | 15/04/2026 | 3 | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| Avon Road, Whitecross | 3 | 13/04/2026 | 15/04/2026 | 6 | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| Breadalbane Place, Polmont | 105 | 11/12/2025 | 12/05/2026 | jct dochart to 21 | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Manuel Terrace, Whitecross | 3 | 13/04/2026 | 15/04/2026 | jct | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| Main Street, Polmont | 10 | 23/03/2026 | 03/04/2026 | jct kirk entry | mains replacement | SGN | PROPOSED WORKS | HIGH | Major |
| Union Road, Falkirk | 21 | 06/04/2026 | 04/05/2026 | 86 | Essential checks to investigate a reported loss of pressure / gas escape | SGN | IN PROGRESS | MEDIUM | Emergency |
| Main Street, Polmont | 10 | 13/04/2026 | 24/04/2026 | Outside No.42 | Gas Alteration | SGN | PROPOSED WORKS | HIGH | Standard |
| Wheatlands Avenue, Bonnybridge | 21 | 20/03/2026 | 17/04/2026 | co-op Insurance society | emergency works to investigate gas escape | SGN | IN PROGRESS | MEDIUM | Emergency |
| Taymouth Road, Polmont | 84 | 13/01/2026 | 08/05/2026 | entire street | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Ure Crescent, Bonnybridge | 21 | 26/03/2026 | 23/04/2026 | jct Skene St | emergency works to investigate potential gas escape | SGN | IN PROGRESS | MEDIUM | Emergency |
| Bo'Ness Road, Polmont | 10 | 23/03/2026 | 03/04/2026 | jct main street | mains replacement | SGN | PROPOSED WORKS | ROAD CLOSURE | Major |
| Lawers Crescent, Polmont | 74 | 19/01/2026 | 30/04/2026 | jct kenmore to os 69 | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Cow Wynd, Falkirk | 21 | 07/04/2026 | 05/05/2026 | 28 | emergency works to investigate gas escape | SGN | IN PROGRESS | HIGH | Emergency |
| Gowan Avenue, Falkirk | 10 | 01/04/2026 | 14/04/2026 | Outside No.8 | New Gas Connection | SGN | IN PROGRESS | MEDIUM | Standard |
| Station Road, Polmont | 21 | 07/04/2026 | 05/05/2026 | @ sub station | emergency works to investigate gas escape | SGN | IN PROGRESS | HIGH | Emergency |
| Killin Drive, Polmont | 84 | 13/01/2026 | 08/05/2026 | 1 to 22 | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Portree Crescent, Polmont | 84 | 13/01/2026 | 08/05/2026 | 3 | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Grangemouth Road, Falkirk | 939 | 03/07/2023 | 26/02/2027 | Jct. of Middlefield Road to Westfield R/A. | Widening of A904. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Nethermains Road, Denny | 2 | 27/04/2026 | 28/04/2026 | Nethermains Road After Myothill Road FK6 5NY | Replacement of bus shelter Contractor: Commutaports Contact: Stephen Keegan SKeegan@commutaports.com / 0141 762 2626 | Falkirk Council | PROPOSED WORKS | HIGH | Minor With Excavation |
| Annet Road, Head Of Muir | 11 | 02/04/2026 | 16/04/2026 | full street | tracking works reinstatement column removals | Falkirk Council | IN PROGRESS | MEDIUM | Standard |
| Westfield Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | Westfield Roundabout. | Signalisation of roundabout & construction of left turn lanes. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Albert Road, Falkirk | 3 | 15/04/2026 | 19/04/2026 | Drossie Road to No. 27 | Carriageway resurfacing remedial works | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | Standard |
| Vellore Road, Maddiston | 1 | 01/05/2026 | 01/05/2026 | Murray Cres Outside No 30 FK2 0AW | Replacement of bus shelter Contractor: Commutaports Contact: Stephen Keegan SKeegan@commutaports.com / 0141 762 2626 | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| C51 From Lathallan Roundabout To Smiddy Brae Polmont With Branch To Wholeflats Road, Falkirk | 331 | 17/03/2025 | 26/06/2026 | Jinkabout Bridge junction to Polmonthill Cottage | Land slip | Falkirk Council | IN PROGRESS | ROAD CLOSURE | Emergency |
| Hawley Road, Falkirk | 3 | 14/04/2026 | 16/04/2026 | Whole street | Coring operation | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Oliver Road, Falkirk | 3 | 14/04/2026 | 16/04/2026 | Whole street | Coring operation | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Colonsay Avenue, Polmont | 3 | 13/04/2026 | 15/04/2026 | Salmon Inn Road to Morven Drive | Carriageway resurfacing remedial works | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | Minor With Excavation |
| Nethermains Road, Denny | 2 | 27/04/2026 | 28/04/2026 | Nethermains Road Before Glasgow Road FK6 5EB | Replacement of bus shelter Contractor: Commutaports Contact: Stephen Keegan SKeegan@commutaports.com / 0141 762 2626 | Falkirk Council | PROPOSED WORKS | HIGH | Minor With Excavation |
| Morven Drive, Polmont | 3 | 13/04/2026 | 15/04/2026 | Colonsay Ave. to Tiree Cresc. | Carriageway resurfacing remedial works | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | Minor With Excavation |
| Redding Road, Brightons | 2 | 30/04/2026 | 01/05/2026 | Redding Road Before Harlow Avenue FK2 0HZ | Replacement of bus shelter Contractor: Commutaports Contact: Stephen Keegan SKeegan@commutaports.com / 0141 762 2626 | Falkirk Council | PROPOSED WORKS | HIGH | Minor With Excavation |
| A9 From Falkirk Stadium Roundabout To Westfield Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | A9 | Widening of A9 as part of the TIF Infrastructure Improvements. | Falkirk Council | IN PROGRESS | HIGH | Major |
| King Street, Stenhousemuir | 2 | 10/04/2026 | 13/04/2026 | Main Street to Hallam Road | Coring operation | Falkirk Council | PROPOSED WORKS | HIGH | Minor With Excavation |
| Telford Square, Falkirk | 10 | 20/04/2026 | 01/05/2026 | Eastern and southern footway of Telford Square | Footway upgrading works | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | Standard |
| Stenhouse Road, Stenhousemuir | 11 | 30/03/2026 | 13/04/2026 | stenhouse road between juction of lodge drive and main street | entered by gordon ross, wall repair works next to footpath | Falkirk Council | IN PROGRESS | HIGH | Standard |
| A904 From Falkirk Road Grangemouth To Westfield Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | Westfield R/A to Midthorn Bridge. | Widening of A904 & installation of new underpass @ Midthorn. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Drossie Road, Falkirk | 3 | 15/04/2026 | 19/04/2026 | Whole road | Carriageway resurfacing remedial works | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | Standard |
| Bantaskine Drive, Falkirk | 3 | 20/04/2026 | 22/04/2026 | Whole street | Carriageway resurfacing remedial works | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | Minor With Excavation |
| A9 From Westfield Roundabout To Etna Road Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | A9. | Widening A9 & construction of a new r/a as part of the TIF Infrastructure Improvements. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Redding Road, Westquarter | 1 | 01/05/2026 | 01/05/2026 | Redding Road After & Opp Woodburn Ave FK2 9XJ | Replacement of bus shelter Contractor: Commutaports Contact: Stephen Keegan SKeegan@commutaports.com / 0141 762 2626 | Falkirk Council | PROPOSED WORKS | HIGH | Minor With Excavation |
| Seaton Place, Falkirk | 1 | 27/04/2026 | 27/04/2026 | Maxwell Tower | Road Occupation | Falkirk Council | RECORDED | ROAD CLOSURE | Permission |
| Maddiston Road, Brightons | 5 | 13/04/2026 | 19/04/2026 | Maddiston Road, Rumford northwards for 100m | Carriageway resurfacing | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | MAJOR WORKS |
| Lochgreen Road, Falkirk | 1 | 15/04/2026 | 15/04/2026 | NR 78 Slamannan Road Falkirk | Off peak working (09.30 to 15.30). Without Excavation. 5-Way lights required to provide safe access to overhead network to complete cabling work. Grid Ref: 287688,678876. Please see attached CAD drawing. | BT | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| Slamannan Road, Falkirk | 1 | 15/04/2026 | 15/04/2026 | NR 78 Slamannan Road Falkirk | Off peak working (09.30 to 15.30). Without Excavation. 5-Way lights required to provide safe access to overhead network to complete cabling work. Grid Ref: 287762, 678879. Please see attached CAD drawing. | BT | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| Grahams Road, Falkirk | 1 | 15/04/2026 | 15/04/2026 | O/S 3 GOWAN AVENUE FALKIRK | Off peak working (09:30–15:30). With no excavation. Road narrows required to access manhole to carry out cabling work. Grid ref: 288822,680802. Please see attached CAD drawing. | BT | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| B816 From Tamfourhill Road Falkirk To Bonnyhill Road High Bonnybridge, Bonnybridge | 10 | 21/04/2026 | 04/05/2026 | R H I REFRACTORS UK LTD | EXCAVATE AND REINSTATE FOR REPAIR TO STREET LIGHTING FAULT | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Broomhill Road, High Bonnybridge | 10 | 16/04/2026 | 29/04/2026 | Broomhill Road, High Bonnybridge, Falkirk | EXC, & REPAIR TO STREET LIGHTING FAULT | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Glenburn Road, Falkirk | 2 | 20/04/2026 | 21/04/2026 | Between Beauly Court and Mudale Court | Traffic management only, to facilitate safe access via adjacent footpath for repair works on railway bridge. Site times 07:00 - 18:00 for 2 day shifts | Network Rail | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| B825 From Manuel Terrace Whitecross To A803, Whitecross | 25 | 06/04/2026 | 10/05/2026 | Outside Manuelhaugh Farm steading in carriageway | Carry out new mains installation works | Scottish Water | PROPOSED WORKS | MEDIUM | Major |
| C51 From Lathallan Roundabout To Smiddy Brae Polmont With Branch To Wholeflats Road, Falkirk | 73 | 27/04/2026 | 05/08/2026 | 100M EITHER SIDE OF GOLF CLUB | TEMPORARY MAIN INSTALLATION | Scottish Water | ADVANCE PLANNING | HIGH | Standard |
| Almond Terrace, Whitecross | 10 | 31/03/2026 | 13/04/2026 | Works are in the carriageway on Almond Terrace at the 5 way junction. | Works required to excavate and install MU for the new housing development. | The Electricity Network Company Limited | IN PROGRESS | MEDIUM | Standard |