Roadworks in Falkirk
Roadworks in Falkirk – June 2026
This page provides up-to-date information on planned and ongoing roadworks across Falkirk and surrounding communities during June 2026. Please note that dates may change depending on weather conditions and operational requirements.
If you are travelling locally, please allow extra time for your journey and follow any temporary signs or diversions in place.
| Full Address | Duration | Planned Start | Planned End | Location | Description | Promoter Name | Status | Traffic Impact | Works Type |
|---|---|---|---|---|---|---|---|---|---|
| Strathyre Place, Falkirk | 6 | 18/06/2026 | 25/06/2026 | Side of 39 ACHRAY DRIVE on STRATHYRE PLACE | PIA Carriageway blockage (cobbles) | Virgin Media Limited | PROPOSED WORKS | MEDIUM | Standard |
| Arnothill, Falkirk | 27 | 17/06/2026 | 23/07/2026 | 8 Arnothill Falkirk,, FK1 5RY | 9m Road crossing and chamber | Virgin Media Limited | PROPOSED WORKS | ROAD CLOSURE | Major |
| Denny Road, Head Of Muir | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Caples m(new development) | Falkirk Council | PROPOSED WORKS | MEDIUM | Major |
| Glasgow Road, Dennyloanhead | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Cables (new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| C2 From B803 To Main Street Shieldhill, Falkirk | 10 | 22/06/2026 | 05/07/2026 | Stag Lodges | Water connection | Falkirk Council | PROPOSED WORKS | MEDIUM | Standard |
| Drove Road, Head Of Muir | 92 | 23/02/2026 | 30/06/2026 | Drove Roat - Glasgow Road | S109 Install Scottish Power Caples m(new development) | Falkirk Council | PROPOSED WORKS | MEDIUM | Major |
| Main Street, Shieldhill | 10 | 26/05/2026 | 08/06/2026 | #135 | Water connection | Falkirk Council | PROPOSED WORKS | MEDIUM | Standard |
| Glasgow Road, Longcroft | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Cables (new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| Glasgow Road, Denny | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Caples m(new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| Denny Road, Dennyloanhead | 92 | 23/02/2026 | 30/06/2026 | Drove Road - Glasgow Road | S109 Install Scottish Power Cables (new development) | Falkirk Council | PROPOSED WORKS | HIGH | Major |
| Hillview Road, High Bonnybridge | 1 | 11/06/2026 | 11/06/2026 | 34 Church Street Bonnybridge FK4 2AZ | safe access required to carriageway box for engineers to provide service to a customer. 3 way lights. 1 working day 09:30 - 15:30 ** No Excavation ** | BT | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| Church Street, High Bonnybridge | 1 | 11/06/2026 | 11/06/2026 | 34 Church Street Bonnybridge FK4 2AZ | safe access required to carriageway box for engineers to provide service to a customer. 3 way lights. 1 working day 09:30 - 15:30 ** No Excavation ** | BT | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| Park Street, High Bonnybridge | 10 | 08/06/2026 | 19/06/2026 | O/S -5 PARK STREET B9NNYBRIDGE FK4 2AS | Enabling new localised ultra-fast broadband connections This activity involves excavation to install telecoms duct to provide essential service and reinstatement | BT | PROPOSED WORKS | MEDIUM | Standard |
| Gibbdun Place, Head Of Muir | 10 | 26/05/2026 | 08/06/2026 | O/S 4, Gibbdun Place, Denny, FK6 5PH | Enabling new localised ultra-fast broadband connections This activity involves excavation to install telecoms duct to provide essential service and reinstatement | BT | IN PROGRESS | MEDIUM | Standard |
| Gardrum Gardens, Shieldhill | 3 | 28/05/2026 | 01/06/2026 | 9 GARDRUM GARDENS POLMONT FK1 2TB | Enabling telecoms duct to provide service and reinstatement new localised ultra-fast broadband connections This activity involves excavation to Install | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Brechin Drive, Polmont | 3 | 29/05/2026 | 02/06/2026 | o/s 61 BRECHIN DRIVE POLMONT FK20YH | Enabling new localised ultra-fast broadband connections This activity involves excavation to Install telecoms duct to provide service and reinstatement | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Morrison Avenue, Bonnybridge | 3 | 01/06/2026 | 03/06/2026 | o/s 14 MORRISON AVENUE FK4 1ET | Enabling new localised ultra-fast broadband connections This activity involves excavation to install telecoms duct to provide essential service and reinstatement | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Easton Drive, Shieldhill | 3 | 27/05/2026 | 29/05/2026 | 74 EASTON DRIVE SHIELDHILL FALKIRK FK1 2TA | Enabling telecoms duct to provide service and reinstatement new localised ultra-fast broadband connections This activity involves excavation to Install | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Belmont Avenue, Shieldhill | 3 | 27/05/2026 | 29/05/2026 | 57 BELMONT AVENUE SHIELDHILL FALKIRK FK1 2BS | Enabling telecoms duct to provide service and reinstatement new localised ultra-fast broadband connections. This activity involves excavation to install | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Belmont Avenue, Shieldhill | 3 | 28/05/2026 | 01/06/2026 | 19 BELMONT AVENUE SHIELDHILL FALKIRK FK1 2BS | Enabling telecoms duct to provide service and reinstatement new localised ultra-fast broadband connections This activity involves excavation to Install | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Battock Road, Brightons | 10 | 28/05/2026 | 10/06/2026 | 50 BATTOCK ROAD BRIGHTONS FALKIRK FK2 0TT | Enabling telecoms duct to provide service and reinstatement new localised ultra-fast broadband connections This activity involves excavation to Install | BT | IN PROGRESS | MEDIUM | Standard |
| M9 Eastbound From Junction 4 To Council Boundary, Falkirk | 20 | 25/05/2026 | 20/06/2026 | M9 - EB - Jct 4 to Jct 3 Mill Road to Gilston Burn | Nightworks - drainage works - Alternate lane closures | Transport Scotland - SE Unit Op Company | IN PROGRESS | MEDIUM | Standard |
| M9 Westbound From Council Boundary To Junction 4, Falkirk | 20 | 25/05/2026 | 20/06/2026 | M9 - WB - Jct 3 to Jct 4 Mill Road to Gilston Burn and Jct 4 WB on slip | Nightworks - drainage works - Alternate lane closures with a Jct 4 on slip lane closure. | Transport Scotland - SE Unit Op Company | IN PROGRESS | MEDIUM | Standard |
| M876 Westbound From Junction 1 To Junction With M80, Falkirk | 65 | 13/04/2026 | 11/07/2026 | M80 - NB /SB - Jct 7 to Jct 9 and associated slips with M876 Jct 1 WB/EB | nightworks - Gantry replacement works - Road closures Dates TBC, no weekends. i. M80 Northbound traffic will be directed to leave the motorway at Junction 6 Old Inns and follow the B816 to Bonnybridge at then east from Bonnybridge along the A803 before taking the A883 at the Three Bridges Roundabout then join the M876 at Junction 1, leave the M876 at Junction 3 Bowtrees and use the interchange to turn and re-join the M876 westbound from where they will join the M9 northbound at Junction 7 and continue towards Junction 9.ii. M876 Westbound traffic will be directed to leave the motorway at Junction 1 onto the B905 towards the Checkbar Roundabout and then take the A883 east. At the Three Bridges Roundabout they would be diverted west along the A803 to Bonnybridge and then onto the B816 until the Old Inns interchange where they can join the M80.iii. M80 Southbound traffic from Junction 9 will be directed to continue on the M9 and exit on to the M876 at Junction 7 Kinnaird. They would then be directed to leave the M876 at Junction 3 Bowtrees and use the interchange to turn and re-join the M876 westbound from where they would continue until Junction 1 and then follow the M876 diversion as above. | Transport Scotland - SE Unit Op Company | IN PROGRESS | ROAD CLOSURE | Major |
| M80 Northbound From Junction 7 To Junction 8, Falkirk | 65 | 13/04/2026 | 11/07/2026 | m80 - jct 7-8 m876 join to m80 | dayworks - hard shoulder closure/nightworks - lane closure - Gantry replacement. | Transport Scotland - SE Unit Op Company | IN PROGRESS | MEDIUM | Major |
| M9 Eastbound Junction 4 On-Slip From Junction 5, Polmont | 10 | 22/06/2026 | 04/07/2026 | M9 - EB - Jct 4 on slip | Nightworks - drainage works - slip closure.At Junction 4 (Lathallan Interchange), motorists intending to join the eastbound carriageway will be diverted along the westbound carriageway - follow the diversion signs, take the exit at Junction 5, stay in lane for M9(S) at the roundabout, exit roundabout to join the M9 eastbound carriageway at Junction 5. | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | HIGH | Standard |
| M876 Eastbound Junction 1 Off And On Slip From Junction With M80, Denny | 22 | 01/06/2026 | 30/06/2026 | M876 - EB - Junction 1 On slip | Nightworks - bridge repairs - On slip road closure with continuous hard shoulder closure.Diversion - Surface traffic will be advised of slip Eastbound on slip closure on approach to Herbertshire Rbt on the West and Checkbar Rbt from the East . Traffic will be directed to take the A883 East to Three Bridges Rbt. Take the first exit onto the A803 Glasgow Road and continue East to Camelon Rbt. Take the first exit onto the A9 Stirling Road and head North and continue to re-join the M876 Eastbound at Jct 2 Larbert. | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | HIGH | Major |
| M876 Westbound From Junction 1 To Junction With M80, Falkirk | 47 | 05/06/2026 | 10/08/2026 | M876 - WB - Jct 1 to M80 Merge (Jct 8) | Continuous - structural repairs - Lane closure | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | MEDIUM | Major |
| M9 Eastbound Junction 4 Off-Slip From Junction 5, Polmont | 2 | 01/06/2026 | 02/06/2026 | M9 - EB - Jct 4 off slip | Nightworks - patching - Alternate lane closures | Transport Scotland - SE Unit Op Company | PROPOSED WORKS | HIGH | Minor With Excavation |
| From B902 Grahams Road Roundabout To Central Retail Park With Branch To Galloway Street, Falkirk | 3 | 10/06/2026 | 12/06/2026 | At the junction with Grahams Road Roundabout | Telecoms Works to swap out exisiting 20m for an upgraded 20m structure using a HIAB. Road closure to be in place for the works with the adjacent footway closed | Telefonica UK | PROPOSED WORKS | ROAD CLOSURE | Major |
| Main Street, Camelon, Falkirk | 2 | 08/06/2026 | 09/06/2026 | Opposite the junction with Dorrator Road | Swapping of existing 20m Structure for new 20m structure using HIAB. Lane narrowing in place with adjacent cycle lane & bus lanes to be suspended. Adjacent footway to also be closed for the duration of the works | Telefonica UK | PROPOSED WORKS | HIGH | Major |
| Main Street, Redding | 5 | 22/06/2026 | 26/06/2026 | GRANGEMOUTH - 27 WAVERLEY PARK, REDDING, FALKIRK, FK2 9RT | clear blockages | BT | PROPOSED WORKS | ROAD CLOSURE | Standard |
| New Hallglen Road, Falkirk | 2 | 28/05/2026 | 29/05/2026 | (FALKIRK ) New Hallglen Road, Hallglen, Falkirk, Scotland, FK1 2PP, | New Pole | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Wallace Crescent, Brightons | 1 | 04/06/2026 | 04/06/2026 | (POLMONT) OS ARDEN COTTAGE, REDDING ROAD, BRIGHTONS, FALKIRKFK2 0HE | Replace pole | BT | PROPOSED WORKS | ROAD CLOSURE | Major |
| Spence Street, Bonnybridge | 1 | 30/06/2026 | 30/06/2026 | (BONNYBRIDGE) OR OF 10 SPENCE STREET, BONNYBRIDGEFK4 1NH | Replace pole | BT | PROPOSED WORKS | ROAD CLOSURE | Major |
| Ochil View, Denny | 3 | 28/05/2026 | 01/06/2026 | DENNY - 52 OCHIL VIEW, FK6 5NH | excavate to lay duct | BT | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Main Street, Shieldhill | 10 | 22/06/2026 | 03/07/2026 | O/s 139 | EXCAVATION INSTALLATION AND REINSTATEMENT FOR NEW ELECTRIC SERVICE | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Haining Road, Whitecross | 67 | 22/04/2026 | 23/07/2026 | Along Haining Road | EXCAVATE, BACKFILL & REINSTATE FOR NEW SUPPLY | SP Energy Networks | IN PROGRESS | MEDIUM | Major |
| Cross Brae, Shieldhill | 10 | 22/06/2026 | 03/07/2026 | Opp 139 | EXCAVATION INSTALLATION AND REINSTATEMENT FOR NEW ELECTRIC SERVICE | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Bonnybridge Road, Dennyloanhead | 10 | 13/06/2026 | 26/06/2026 | O/S 6 | Excavate, backfill & reinstate to provide new service | SP Energy Networks | ADVANCE PLANNING | HIGH | Standard |
| Abbots Road, Falkirk | 3 | 01/06/2026 | 03/06/2026 | From Abbots Road Roundabout | **REMEDIAL PHASE** - Rectify defects | SP Energy Networks | PROPOSED WORKS | MEDIUM | Remedial Other |
| Manuel Terrace, Whitecross | 67 | 30/04/2026 | 31/07/2026 | O/S PO | Excavate, track, backfill & reinstate for new services | SP Energy Networks | IN PROGRESS | MEDIUM | Major |
| A9 From Merchiston Roundabout To Rosebank Roundabout, Falkirk | 7 | 29/06/2026 | 07/07/2026 | A9 From Merchiston Roundabout To Rosebank Roundabout, Falkirk | Upgrade of SPEN Infrastructure from Bonnybridge to Bainsford Substations which include excavations, cabling & chamber build. | SP Energy Networks | ADVANCE PLANNING | HIGH | Standard |
| Avontoun Crescent, Whitecross | 68 | 30/04/2026 | 03/08/2026 | O/S 2 - 24 | Excavate, track, backfill & reinstate for new services | SP Energy Networks | IN PROGRESS | MEDIUM | Major |
| Carronside Street, Falkirk | 84 | 01/06/2026 | 24/09/2026 | Along Carronside Street to junc of Haugh Street | Excavate, backfill and reinstate in footpath & Carriageway to install new Electrical Mains Cable & transfer new services | SP Energy Networks | PROPOSED WORKS | MEDIUM | Major |
| Abbotsford Street, Falkirk | 84 | 01/06/2026 | 24/09/2026 | Junc of Haugh Street to O/S S/S to along Abbotsford Road | Excavate, backfill and reinstate in footpath & Carriageway to install new Electrical Mains Cable & transfer new services | SP Energy Networks | PROPOSED WORKS | MEDIUM | Major |
| Almond Terrace, Whitecross | 67 | 30/04/2026 | 31/07/2026 | O/S 10 | EXCAVATE, BACKFILL & REINSTATE FOR NEW SUPPLY | SP Energy Networks | IN PROGRESS | MEDIUM | Major |
| Bantaskine Street, Falkirk | 10 | 01/06/2026 | 14/06/2026 | O/S 46 | Excavating to provide a new service | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Bantaskine Street, Falkirk | 10 | 02/06/2026 | 15/06/2026 | 85-87 | Excavate, backfill & reinstate to provide new service | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Carribber Avenue, Whitecross | 67 | 23/04/2026 | 24/07/2026 | O/S 1 & 8 - 12 | Excavate, track, backfill & reinstate for new services | SP Energy Networks | IN PROGRESS | MEDIUM | Major |
| Mclaren Avenue, Whitecross | 63 | 30/04/2026 | 27/07/2026 | Junc of Avontoun Crescent | Excavate, track, backfill & reinstate for new services | SP Energy Networks | IN PROGRESS | MEDIUM | Major |
| Carmuirs Street, Falkirk | 11 | 04/06/2026 | 18/06/2026 | Jan-14 | Excavate, backfill & reinstate to provide new service | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Merchiston Road, Falkirk | 7 | 29/06/2026 | 07/07/2026 | Merchiston Road | Upgrade of SPEN Infrastructure from Bonnybridge to Bainsford Substations which include excavations, cabling & chamber build. | SP Energy Networks | PROPOSED WORKS | MEDIUM | Standard |
| Haugh Street, Falkirk | 84 | 01/06/2026 | 24/09/2026 | From junc of Carronside Street to O/S 170 Haugh Street | Excavate, backfill and reinstate in footpath & Carriageway to install new Electrical Mains Cable & transfer new services | SP Energy Networks | PROPOSED WORKS | HIGH | Major |
| Avon Road, Whitecross | 67 | 22/04/2026 | 23/07/2026 | O/S 1 & 2 | EXCAVATE, BACKFILL & REINSTATE FOR NEW SUPPLY | SP Energy Networks | IN PROGRESS | MEDIUM | Major |
| Station Road, Whitecross | 67 | 27/04/2026 | 28/07/2026 | O/S 50 - 42 & o/s 17 & 28 - 38 | Excavate, track, backfill & reinstate for new services | SP Energy Networks | IN PROGRESS | MEDIUM | Major |
| Main Street, Carronshore | 10 | 28/05/2026 | 10/06/2026 | O/S No52, Main Street, Carronshore, Falkirk | Excavate for a new service | SP Energy Networks | IN PROGRESS | MEDIUM | Standard |
| Bonnyfield Road, Bonnybridge | 10 | 13/06/2026 | 26/06/2026 | O/S 4 | Excavate, backfill & reinstate to provide new service | SP Energy Networks | ADVANCE PLANNING | HIGH | Standard |
| A9 From Etna Road Roundabout To Abbots Road Roundabout, Falkirk | 2 | 04/06/2026 | 06/06/2026 | Roughly 192m North of Etna Rd Roundabout to Abbots Rd Roundabout | Excavate track re cable lay. | SP Energy Networks | PROPOSED WORKS | HIGH | Remedial Other |
| Achray Drive, Falkirk | 3 | 29/05/2026 | 02/06/2026 | 25 Achray Drive Lionthorne | Noisy Manhole causing concern to residents | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Achray Drive, Falkirk | 3 | 29/05/2026 | 02/06/2026 | 25 Achray Drive Lionthorne | Noisy sw manhole | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| A904 From Grangemouth Road Bo'Ness To Inveravon Roundabout, Bo'ness | 1 | 05/06/2026 | 06/06/2026 | At entrance to Belgica | Low rocking FH surround breaking up | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Redding Road, Reddingmuirhead | 6 | 29/06/2026 | 06/07/2026 | OS GLENBOGIE | Sewer R&M - 1st dig to repair hole in sewer allowing debris to enter the line at 0.9m depth, 2nd dig to repair broken joint at 1.1m depth | Scottish Water | ADVANCE PLANNING | ROAD CLOSURE | Major |
| Zetland Place, Skinflats | 10 | 20/05/2026 | 02/06/2026 | OS NO 15 & 19 | URGENT - LEAKAGE REPAIR | Scottish Water | IN PROGRESS | MEDIUM | Urgent |
| Bonnyvale Place, Bonnybridge | 7 | 27/05/2026 | 04/06/2026 | no 12 | 1.8m dig on footfath to repair backlying pipe, 1.5m to be re layed from outlet of manhole | Scottish Water | IN PROGRESS | MEDIUM | Standard |
| Windsor Road, Falkirk | 3 | 28/05/2026 | 01/06/2026 | Opposite Strachan Street Jct | Low worn MH cover no skid resistance | Scottish Water | IN PROGRESS | MEDIUM | Minor With Excavation |
| Grahamsdyke Street, Laurieston | 3 | 28/05/2026 | 01/06/2026 | 12, MARY STREET,LAURIESTONFALKIRKFK2 9PW | Locate toby | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| High Station Road, Falkirk | 8 | 25/05/2026 | 03/06/2026 | OS NO 112 | URGENT - LEAKAGE REPAIR | Scottish Water | IN PROGRESS | HIGH | Urgent |
| Windsor Road, Falkirk | 3 | 29/05/2026 | 02/06/2026 | 30M from jct Glenfuir Road | Worn MH cover, no skid resistance | Scottish Water | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Jarvie Road, Redding | 3 | 10/06/2026 | 12/06/2026 | 14 Jarvie Road Redding | SW Manhole low and causing concern | Scottish Water | PROPOSED WORKS | ROAD CLOSURE | Minor With Excavation |
| Redding Road, Brightons | 6 | 29/06/2026 | 06/07/2026 | GRANGE COMMUNITY CENTRE, REDDING ROAD,BRIGHTONSFALKIRKFK2 0AA | Clear out toby | Scottish Water | ADVANCE PLANNING | HIGH | Standard |
| Duke Street, Denny | 3 | 09/06/2026 | 11/06/2026 | Duke Street at Jct of Davies Row, Denny FK6 6DB | REMOVE FH | Scottish Water | PROPOSED WORKS | HIGH | Minor With Excavation |
| Main Road, Maddiston | 2 | 18/06/2026 | 19/06/2026 | Jct Kenny Drive | 4 Sv's 1 FH and 2 broken tobies 1 cover missing | Scottish Water | PROPOSED WORKS | HIGH | Minor With Excavation |
| Main Street, Redding | 3 | 15/06/2026 | 17/06/2026 | J/N 1 | Perm Proposed Of Excavate footway to repair chamber | Virgin Media Limited | PROPOSED WORKS | MEDIUM | Remedial Other |
| Stirling Street, Denny | 3 | 15/06/2026 | 17/06/2026 | 80 | Rectify Concrete fillet | Virgin Media Limited | PROPOSED WORKS | MEDIUM | Remedial Other |
| Glasgow Road, Denny | 2 | 14/06/2026 | 16/06/2026 | O/s 37 | Excavate footway to repair chamber | Virgin Media Limited | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| Stirling Street, Dunipace | 26 | 15/06/2026 | 20/07/2026 | bridge to 195 | mains replacement | SGN | PROPOSED WORKS | HIGH | Major |
| Church Street, Stenhousemuir | 88 | 27/05/2026 | 26/09/2026 | 13 | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| B8028 From Falkirk Road Glen Village To Cross Brae Shieldhill, Falkirk | 3 | 08/06/2026 | 10/06/2026 | jct easton drive to os gas governer | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| California Road, Shieldhill | 3 | 08/06/2026 | 10/06/2026 | jct shieldhill | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| Stirling Street, Denny | 20 | 29/06/2026 | 24/07/2026 | 46 to 147 | mains replacement | SGN | ADVANCE PLANNING | HIGH | Major |
| Dochart Crescent, Polmont | 279 | 17/12/2025 | 21/01/2027 | entire street | mains replacement | SGN | IN PROGRESS | MEDIUM | Major |
| Main Street, Shieldhill | 3 | 08/06/2026 | 10/06/2026 | jct california road | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| Ivybank Court, Polmont | 16 | 19/05/2026 | 09/06/2026 | entire street | mains replacement | SGN | ADVANCE PLANNING | MEDIUM | Major |
| Cross Brae, Shieldhill | 3 | 08/06/2026 | 10/06/2026 | jct main st to jct easton Drive | remedial works | SGN | PROPOSED WORKS | MEDIUM | Remedial Other |
| Main Street, Camelon, Falkirk | 11 | 29/05/2026 | 12/06/2026 | NEAR 192 | Disconnection/ Reconnection of Telemast site | SP Energy Networks | PROPOSED WORKS | HIGH | Standard |
| Ochiltree Terrace, Falkirk | 10 | 27/05/2026 | 09/06/2026 | O/s Social club | Disconnection of electrical supply to Ochiltree social club | SP Energy Networks | IN PROGRESS | MEDIUM | Standard |
| Union Road, Falkirk | 9 | 26/05/2026 | 05/06/2026 | Main Street to Lock Sixteen | Carriageway resurfacing | Falkirk Council | IN PROGRESS | ROAD CLOSURE | MAJOR WORKS |
| Station Road, Whitecross | 3 | 08/06/2026 | 10/06/2026 | 30mph to C7 | Surface dressing | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | Minor Without Excavation |
| Telford Square, Falkirk | 10 | 19/05/2026 | 01/06/2026 | Western and northern footway of Telford Square | Footway upgrading works | Falkirk Council | IN PROGRESS | ROAD CLOSURE | Standard |
| A9 From Falkirk Stadium Roundabout To Westfield Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | A9 | Widening of A9 as part of the TIF Infrastructure Improvements. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Telford Square, Falkirk | 3 | 03/06/2026 | 05/06/2026 | Simpson Street to Fleming Gardens | Carriageway resurfacing | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | MAJOR WORKS |
| Parkhall Drive, Maddiston | 3 | 15/06/2026 | 17/06/2026 | 20 Parkhall Drive | Replace road gully unit | Falkirk Council | PROPOSED WORKS | MEDIUM | Minor With Excavation |
| A9 From Etna Road Roundabout To Abbots Road Roundabout, Falkirk | 3 | 08/06/2026 | 10/06/2026 | Abbots Road Rbt. to Etna Road Rbt. | Surface dressing | Falkirk Council | PROPOSED WORKS | HIGH | Minor Without Excavation |
| Westfield Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | Westfield Roundabout. | Signalisation of roundabout & construction of left turn lanes. | Falkirk Council | IN PROGRESS | HIGH | Major |
| C51 From Lathallan Roundabout To Smiddy Brae Polmont With Branch To Wholeflats Road, Falkirk | 331 | 17/03/2025 | 26/06/2026 | Jinkabout Bridge junction to Polmonthill Cottage | Land slip | Falkirk Council | IN PROGRESS | ROAD CLOSURE | Emergency |
| B825 From Manuel Terrace Whitecross To A803, Whitecross | 1 | 16/06/2026 | 16/06/2026 | Linlithgow Bridge | Linlithgow Deacon’s Court | Falkirk Council | RECORDED | ROAD CLOSURE | Event |
| A904 From Falkirk Road Grangemouth To Westfield Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | Westfield R/A to Midthorn Bridge. | Widening of A904 & installation of new underpass @ Midthorn. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Fleming Gardens, Falkirk | 4 | 03/06/2026 | 08/06/2026 | Telford Square to Telford Square junctions | Carriageway resurfacing | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | MAJOR WORKS |
| Hunter Gardens, Denny | 4 | 22/06/2026 | 25/06/2026 | Whole street | Carriageway resurfacing | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | MAJOR WORKS |
| Anson Avenue, Falkirk | 6 | 08/06/2026 | 15/06/2026 | 69 Anson Ave. to Howard St. | Carriageway resurfacing | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | MAJOR WORKS |
| Bonnywood Avenue, Bonnybridge | 10 | 01/06/2026 | 12/06/2026 | Ure Crescent to Wheatlands Avenue | Drainage investigation | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | Standard |
| A9 From Westfield Roundabout To Etna Road Roundabout, Falkirk | 939 | 03/07/2023 | 26/02/2027 | A9. | Widening A9 & construction of a new r/a as part of the TIF Infrastructure Improvements. | Falkirk Council | IN PROGRESS | HIGH | Major |
| Johnston Place, Denny | 3 | 24/06/2026 | 27/06/2026 | Baxters Crescent to Nethermains Road | Carriageway resurfacing | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | MAJOR WORKS |
| C7 From Station Road Whitecross To B825, Whitecross | 3 | 08/06/2026 | 10/06/2026 | Station Road to B825 | Surface dressing | Falkirk Council | PROPOSED WORKS | ROAD CLOSURE | Minor Without Excavation |
| Grangemouth Road, Falkirk | 939 | 03/07/2023 | 26/02/2027 | Jct. of Middlefield Road to Westfield R/A. | Widening of A904. | Falkirk Council | IN PROGRESS | HIGH | Major |
| M80 From Council Boundary To Junction 8, Falkirk | 0 | 20/06/2026 | 20/06/2026 | S/O THE VUE ON M80 | Overnight road closure on the M80 on both sides of the carriageway from 22:00 (23/05/26) to 06:00 (24/05/26) to assist with lowering and raising the overhead conductor what falls directly over the carriageway. | SP Energy Networks | ADVANCE PLANNING | ROAD CLOSURE | Major |
| M80 From Junction 8 To Council Boundary, Falkirk | 0 | 20/06/2026 | 20/06/2026 | S/O THE VUE ON M80 | Overnight road closure on the M80 on both sides of the carriageway from 22:00 (23/05/26) to 06:00 (24/05/26) to assist with lowering and raising the overhead conductor what falls directly over the carriageway. | SP Energy Networks | ADVANCE PLANNING | ROAD CLOSURE | Major |
| Watson Street, Falkirk | 1 | 03/06/2026 | 03/06/2026 | NR FLAT 1TO 6 WATSON STREET FALKIRK FK2 7EX | Off peak working (09.30 to 15.30). Without Excavation. Road closure required to access Joint Box for cabling work. Grid Ref: 288578,680399.Please see attached CAD drawing. | BT | PROPOSED WORKS | ROAD CLOSURE | Major |
| St Crispins Place, Falkirk | 1 | 01/06/2026 | 01/06/2026 | St Crispins Place Callendar Park Woodlands Falkirk Scotland | Off peak working (09:30 – 15:30). 3 Way light required for cabling work to access joint box. Grid ref: 288900, 679670. Please see attached CAD drawing. | BT | PROPOSED WORKS | HIGH | Minor Without Excavation |
| Comely Place, Falkirk | 1 | 01/06/2026 | 01/06/2026 | St Crispins Place Callendar Park Woodlands Falkirk Scotland | Off peak working (09:30 – 15:30). 3 Way light required for cabling work to access joint box. Grid ref: 288900, 679670. Please see attached CAD drawing.This permit link with Activity 4064416 | BT | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| Glenburn Road, Falkirk | 1 | 08/06/2026 | 08/06/2026 | Between Beauly Court and Mudale Court | Traffic management only, to facilitate safe access via adjacent footpath for work on railway . Work times 08:00 to 17:00. | Network Rail | PROPOSED WORKS | MEDIUM | Minor Without Excavation |
| Mary Street, Laurieston | 2 | 01/06/2026 | 02/06/2026 | At Railway Bridge 076/007 | Undertake coring works to LM wingwall as part of Site Investigation Works. Work times 22:00hrs to 06:00hrs | Network Rail | PROPOSED WORKS | HIGH | Minor Without Excavation |
| From B816 To C15 Via Dalnair, Bonnybridge | 2 | 04/06/2026 | 05/06/2026 | Railway bridge | Carry out masonry and pointing repairs to railway bridge. Site times 00:01 - 06:00 on 4th Jun., followed by 21:00 - 06:00 on 4th into 5th June. | Network Rail | PROPOSED WORKS | ROAD CLOSURE | Major |
| Callendar Road, Falkirk | 2 | 01/06/2026 | 02/06/2026 | At Railway Bridge 076/007 | Undertake coring works to LM wingwall as part of Site Investigation Works. Work times 22:00hrs to 06:00hrs | Network Rail | PROPOSED WORKS | HIGH | Minor Without Excavation |
| C51 From Lathallan Roundabout To Smiddy Brae Polmont With Branch To Wholeflats Road, Falkirk | 5 | 04/06/2026 | 10/06/2026 | APPROX 100M EITHER SIDE OF THE BUNGALOW | TRIAL HOLES INVESTIGATION AND TIE IN - remedial phase 26/5. | Scottish Water | PROPOSED WORKS | HIGH | Remedial Other |
| B825 From Manuel Terrace Whitecross To A803, Whitecross | 24 | 26/05/2026 | 28/06/2026 | Outside Manuelhaugh Farm steading in carraigeway | Carry out new mains installation works | Scottish Water | PROPOSED WORKS | MEDIUM | Major |
Stay Informed
I know that roadworks can be frustrating, but these projects are essential in maintaining and improving local roads, utilities, and infrastructure.
To stay updated with the most current roadworks information, please visit the official Scottish Road Works Online website: Scottish Road Works Online.
This page is updated monthly towards the end of each month to highlight roadworks for the upcoming month.